PRODUCTS
- ◆ Semi-Auto Granule Packing Machines
- ◆ Semi-Auto Powder Packing Machines
- ◆ Big Granules and Small Blocks Packing Machines
- ◆ Blocks Packing Machines
- ◆ Blocks Foods Packing Machine
- ◆ Valve Bags Packing Machines
- ◆ Jumbo bags/Big Bags/Ton Bags Packing machines
- ◆ Flux Scales
- ◆ Container Packing Machine
- ◆ One Operator Packing Machine
- ◆ Automatic packaging line
- ◆ Optional Accessories
- ◆ Automatic palletizing line
For Food-Oil Company & Feed Company usage
For grain/food/fertilizer company usage
CONTACT US
Wuxi Ruili Technology Development Co., Ltd.
Address: No.22, Jinyi Road, Qianqiao Industrial Park, Wuxi City, Jiangsu Province
Phone: +86-510-83733721
Fax: +86-510-83733722
Marketing Department:
Manager Tang +86-13812005190
Technology Department:
Manager Chen +86-13771032889
E-mail: ruili@wuxiruili.com
Website: www.soadn.com
Current location: News >> Company News
What are the details of the use of belt scales?
Release date: 2020-12-30 15:50:05 Visits: 368
Belt scales should seal the equipment, keep it dry and clean it often. Pay attention to zero adjustment before and after use. Zero adjustment is a very important operation, otherwise there will be errors.
On belt conveyors, heavy hammer-type tensioning equipment should be used. After the belt has been used for a period of time, the belt may become longer. In this way, the heavy hammer equipment can be used to tighten the belt to ensure that the belt does not deviate and must be zeroed from the beginning.
The weighing roller should be smoothed 1 to 2 times a year, and reset to zero after smoothing. The belt of the belt scale should be calibrated frequently, and the belt is not allowed to run off. If the belt is worn out, a new belt needs to be replaced.
Do not transport wet materials, so as not to stick to the belt and cause measurement errors. The belt must be sorted in time, and the zero must be adjusted in the future.
On belt conveyors, heavy hammer-type tensioning equipment should be used. After the belt has been used for a period of time, the belt may become longer. In this way, the heavy hammer equipment can be used to tighten the belt to ensure that the belt does not deviate and must be zeroed from the beginning.
The weighing roller should be smoothed 1 to 2 times a year, and reset to zero after smoothing. The belt of the belt scale should be calibrated frequently, and the belt is not allowed to run off. If the belt is worn out, a new belt needs to be replaced.
Do not transport wet materials, so as not to stick to the belt and cause measurement errors. The belt must be sorted in time, and the zero must be adjusted in the future.